Search

9329 results for: ‘map’

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • Landing

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012  Its down – Landed ! The first images are already being sent back via Odyssey.  They are Hazcam images, showing a shadow cast by Curiosity on the Gale surface.

  • Sol 1 First Image of Mt. Sharp

    Posted by jbridges in Mars Science Laboratory Blog on August 7, 2012 First Image of the 5.5 km high Mt. Sharp (HazCam), the ultimate target of Curiosity. Two of the Curiosity 50 cm diameter wheels are visible in the foreground.

  • Saturday 5th August Landing Sequence

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 Nominal tones received from MSL. Target location estimated 230 m from centre of ellipse in current trajectory. 10.25 pm Atmospheric entry has occurred.  Now 7 minutes to go. Getting very quiet in the room.

  • Saturday 5th August Landing Sequence

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 10.15 pm. Cruise stage separation successful. Spin down of the aeroshell successful. Nominal ‘heartbeat’ tones from Curiosity. 5.4 km/s and speeding up 6 minutes from atmospheric entry.

Back to top
MENU