Search

17601 results for: ‘(更新)好记网络精仿魅思视频V9,点卡充值VIP功能 免签约 PC WAP双会员系统✅项目合作 二开均可 TG:saolei44✅.lKAxHyAehWbbC’

  • Mars Science Laboratory Blog: Academic and staff blogs from the University of Leicester: Page 16

    Academic and staff blogs from the University of Leicester

  • Thursday 1st Nov 2012 Sol 85

    Posted by jbridges in Mars Science Laboratory Blog on November 1, 2012 Later today I catch my flight back to the UK and swap Mars time for GMT.  Looking back on the first part of this mission, I think we have learnt and achieved a lot.

  • Office health to be boosted by stand up campaign

    Office workers at Leicester’s three hospitals are being encouraged to stand up more on the job as part of a new health drive.

  • Phil Duke

    The academic profile of Dr Phil Duke, Associate Professor at University of Leicester

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

  • 2nd October 2013 Sol 411

    Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.

  • 4th October 2016 Sol 1480

    Posted by jbridges in Mars Science Laboratory Blog on October 4, 2016 This MAHLI mosaic view of Curiosity and Murray Butte no. 12 is where we have just been drilling Quela – the 14th drillhole on Mars.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

Back to top
MENU