Search

9181 results for: ‘易优eyoucms|养生滋补保健品鹿茸虫草类网站模板658✅项目合作 二开均可 TG:saolei44✅.YNwQAEJABq’

  • Thursday 20th September Sol 44

    Posted by jbridges in Mars Science Laboratory Blog on September 20, 2012 The image shows the shadows of Curiosity’s robotic arm and mast approaching our calibration rock.

  • 13th November 2013 Sol 453

    Posted by jbridges in Mars Science Laboratory Blog on November 13, 2013 We have restarted science operations again after the software upload taking longer than expected.

  • 15th May 2014 Sol 630

    Posted by jbridges in Mars Science Laboratory Blog on May 15, 2014 As you can see from this NavCam image we are now driving away from Mt Remarkable.

  • jbridges: Page 27

    This blog is a record of my experiences and work during the Mars Science Laboratory mission, from the preparation, landing on August 5th 2012 Pacific Time, and onwards...I will also post updates about our other Mars work on meteorites, ExoMars and new missions.

  • Expert opinions cover the General Election and the DUP tower blocks and media engagement plans

    Dr Simona Guerra from the School of History, Politics and International Relations recently wrote an article for La Razón discussing the recent snap election called by Theresa May.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • 6th November 2013 Sol 445

    Posted by jbridges in Mars Science Laboratory Blog on November 6, 2013 Curiosity is having a software upgrade this week, so no science operations. We are still at Cooperstown and thinking about the close up images of the outcrop layers.

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

Back to top
MENU