Search

24461 results for: ‘区块链游戏 元宇宙 三界争霸-高端3D手游页游 三界争霸 Win一键既玩服务端 GM后台✅项目合作 二开均可 TG:saolei44✅.jDxJMWGKHYtpTxB’

  • February 10th Sol 182

    Posted by jbridges in Mars Science Laboratory Blog on February 10, 2013 The latest drilling has gone to 6 cm depth and we will use this for CheMin and SAM analyses.

  • About the Department of Molecular and Cell Biology

    Find out more about the Department of Molecular and Cell Biology at the University of Leicester, our history, facilities and services and our commitment to Athena SWAN.

  • 15th June 2013 Sol 305

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2013 This is a NavCam image showing that we have successfully placed the robotic arm turret against this Point Lake outcrop in order to get MAHLI imagery and an APXS analysis.

  • 26th June 2013 Sol 316

    Posted by jbridges in Mars Science Laboratory Blog on June 26, 2013 Curiosity Inspecting Shaler. This HazCam image shows our location at Shaler and the tracks left as we have manoeuvred along the outcrop to look at the planar and cross bedding structures.

  • 24th April 2014 Sol 610

    Posted by jbridges in Mars Science Laboratory Blog on April 24, 2014 We have been doing contact science and taking images in order to zero in on our exact drill point at Mt. Remarkable.

  • 24th June 2016 Sol 1380

    Posted by jbridges in Mars Science Laboratory Blog on June 24, 2016 Here is the latest HiRISE image of Curiosity.  It shows the rover on the Naukluft Plateau where we have been for the last few months.

  • 13th June 2016 Sol 1370

    Posted by jbridges in Mars Science Laboratory Blog on June 13, 2016 Here is the Oudam drillhole and the nearby dump piles for material that has been analysed by CheMin.

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

  • Saturday 11th August Sol 5

    Posted by jbridges in Mars Science Laboratory Blog on August 11, 2012 The software upload is going ahead as planned.  This gives us a breathing space to review the images and plan ahead.

Back to top
MENU