Search
-
11th September 2014 Sol 746
https://staffblogs.le.ac.uk/mars/2014/09/11/11th-september-2014-sol-746/
Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission. This area is called the Pahrump Hills.
-
24th February 2017 – Sol 1620
https://staffblogs.le.ac.uk/mars/2017/02/24/24th-february-2017-sol-1620/
Posted by jbridges in Mars Science Laboratory Blog on February 24, 2017 We have been examining Ireson Hill and found this unusual 10-15 cm diameter rock- called Passagassawakakeag ! The shape is an almost perfect Dreikanter.
-
Friday 14th December Sol 127
https://staffblogs.le.ac.uk/mars/2012/12/14/friday-14th-december-sol-127/
Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far. We are seeing finely layered, continuous beds, with some cross bedded layers.
-
10th January 2014 Sol 509
https://staffblogs.le.ac.uk/mars/2014/01/10/january-10th-2014-sol-509/
Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.
-
5th August 2014 Sol 710
https://staffblogs.le.ac.uk/mars/2014/08/05/5th-august-2014-sol-710/
Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley. On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.
-
15th August 2014 Sol 720
https://staffblogs.le.ac.uk/mars/2014/08/15/15th-august-2014-sol-720/
Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.
-
28th December 2015 Sol 1206
https://staffblogs.le.ac.uk/mars/2015/12/28/28th-december-2015-sol-1206/
Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days. We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.
-
Sol 0 Monday 6th August
https://staffblogs.le.ac.uk/mars/2012/08/06/sol-0-monday-6th-august/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.
-
April 9th 2013 Sol 240
https://staffblogs.le.ac.uk/mars/2013/04/09/april-9th-2013-sol-240/
Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks. We are parked at the John Klein site during this time.
-
17th January 2016 Sol 1226
https://staffblogs.le.ac.uk/mars/2016/01/17/17th-january-2016-sol-1226/
Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.