Search

8944 results for: ‘map’

  • Landing

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012  Its down – Landed ! The first images are already being sent back via Odyssey.  They are Hazcam images, showing a shadow cast by Curiosity on the Gale surface.

  • Saturday 5th August Landing Sequence

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 Nominal tones received from MSL. Target location estimated 230 m from centre of ellipse in current trajectory. 10.25 pm Atmospheric entry has occurred.  Now 7 minutes to go. Getting very quiet in the room.

  • Sol 1 First Image of Mt. Sharp

    Posted by jbridges in Mars Science Laboratory Blog on August 7, 2012 First Image of the 5.5 km high Mt. Sharp (HazCam), the ultimate target of Curiosity. Two of the Curiosity 50 cm diameter wheels are visible in the foreground.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • 14th January 2014 Sol 868

    Posted by jbridges in Mars Science Laboratory Blog on January 14, 2015 We have started the drilling activities at Pahrump (Mojahave outcrop).  This MAHLI image shows that the initial minidrill attempt turned up some unweathered fine grained sediment.

  • 17th July 2015 Sol 1047

    Posted by jbridges in Mars Science Laboratory Blog on July 17, 2015 The science team is considering the next drill target. ChemCam and APXS results suggest that the sediment compositions are changing within the Murray Formation, with more altered compositions.

  • April 9th 2013 Sol 240

    Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks.  We are parked at the John Klein site during this time.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

Back to top
MENU