Search

16332 results for: ‘ThinkPHP5.1单商户B2C商城网站源码pc h5 wap 微信小程序 支付宝小程序✅项目合作 二开均可 TG:saolei44✅.YBEpLoLoMEsn’

  • 2nd October 2013 Sol 411

    Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.

  • 23rd February 2015 Sol 907

    Posted by jbridges in Mars Science Laboratory Blog on February 23, 2015 Our next drill target is Telegraph_Peak.

  • April 9th 2013 Sol 240

    Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks.  We are parked at the John Klein site during this time.

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

  • 11th September 2014 Sol 746

    Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission.  This area is called the Pahrump Hills.

Back to top
MENU