Search

7521 results for: ‘layui爱准挂更新密码静态WEB页(临时)✅项目合作 二开均可 TG:saolei44✅.HproLSkNTZr’

  • Monday 8th October Sol 62

    Posted by jbridges in Mars Science Laboratory Blog on October 8, 2012 The first of our scoops is going well with the soil vibrated in the scoop to remove any excess.

  • Using smart bombs to kill old cells

    A new nanotechnology developed at the University of Leicester could lead to people living longer.

  • 11th May 2016 Sol 1337

    Posted by jbridges in Mars Science Laboratory Blog on May 11, 2016 Sol 1337 means that we have just reached our second martian year since landing in 2012,  Here is a birthday cake to the mission from the ChemCam team in Toulouse.

  • Alumni working outside the UK

    Discover how the legal expertise they gained at Leicester Law School has taken some of our alumni around the world.

  • Spotlight on CLANet -- Deep learning in cell line authentication

    CLANet is an AI framework developed by Professor H Zhou's and collaborators, and funded by AstraZeneca Ltd. Cell line authentication plays a crucial role in the biomedical field, ensuring researchers work with accurately identified cells.

  • Higher Education

    Cancers are responsible for millions of death every year. The study of cancer biology is therefore one of the largest areas of scientific interest. Cancer cells develop specific hallmarks through a series of mutations in both oncogenes and tumour-suppressor genes.

  • 6th March 2015 Sol 918

    Posted by jbridges in Mars Science Laboratory Blog on March 6, 2015 We are in the middle of preparing a 3 sol plan, in the final stages of the Pahrump campaign.

  • Wednesday 10th October Sol 64

    Posted by jbridges in Mars Science Laboratory Blog on October 11, 2012 The camera imaging, ChemCam analyses and scooping are continuing as the small plastic fragment identified to the side of the scoop area is not critical for the arm’s operation.

  • 27th April 2015 Sol 968

    Posted by jbridges in Mars Science Laboratory Blog on April 27, 2015 We are situated at Mt. Shields, having driven along Logan’s Run.  I am Geo Science team Lead today, and we are preparing a 2 sol plan.

  • 22nd September 2015 Sol 1112

    Posted by jbridges in Mars Science Laboratory Blog on September 22, 2015 I have been Geo Science Theme Lead GSTL for the last two sol plan (sols 1112-1113). One of the main topics we have been discussing is where to drill next.

Back to top
MENU