Search

18520 results for: ‘services research data create data create data’

  • Jennifer Cole Wright

    The academic profile of Dr Jennifer Cole Wright, Associate Professor of Marketing / Deputy Dean of Education, School of Business University of Leicester

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • Sol 1 First Image of Mt. Sharp

    Posted by jbridges in Mars Science Laboratory Blog on August 7, 2012 First Image of the 5.5 km high Mt. Sharp (HazCam), the ultimate target of Curiosity. Two of the Curiosity 50 cm diameter wheels are visible in the foreground.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • 27th November 2015 Sol 1176

    Posted by jbridges in Mars Science Laboratory Blog on November 27, 2015 We have reached the Bagnold Dunes and are driving through a gap. The dark colour is due to the iron and magnesium-rich composition  of the sand grains (minerals like olivine and pyroxene).

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • 11th September 2014 Sol 746

    Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission.  This area is called the Pahrump Hills.

  • Saturday 5th August Landing Sequence

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 Nominal tones received from MSL. Target location estimated 230 m from centre of ellipse in current trajectory. 10.25 pm Atmospheric entry has occurred.  Now 7 minutes to go. Getting very quiet in the room.

  • Saturday 5th August Landing Sequence

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 10.15 pm. Cruise stage separation successful. Spin down of the aeroshell successful. Nominal ‘heartbeat’ tones from Curiosity. 5.4 km/s and speeding up 6 minutes from atmospheric entry.

Back to top
MENU