Search

14014 results for: ‘【整套】杰奇1.7小说模板pc wap手机版 安装说明✅项目合作 二开均可 TG:saolei44✅.fpNOQCrUHyrYshq’

  • Web Technologies

    Module code: CO7098 Software engineering often involves large, distributed systems that are not under particular control by anyone.

  • 30th May 2015 Sol 1000

    Posted by jbridges in Mars Science Laboratory Blog on May 30, 2015 An MSL landmark day.  We have reached 1000 sols on Mars.

  • 25th July 2013 Sol 344

    Posted by jbridges in Mars Science Laboratory Blog on July 25, 2013 This HiRISE image shows Curiosity at work at the Shaler outcrop in Yellowknife Bay. The tracks from Bradbury landing are also clearly visible.

  • 1st October 2015 Sol 1121

    Posted by jbridges in Mars Science Laboratory Blog on October 1, 2015 Our latest drillhole has gone successfully, at Big Sky.

  • 18th March 2014 Sol 574

    Posted by jbridges in Mars Science Laboratory Blog on March 18, 2014 Quite a lot of the science team is at the 45th Lunar & Planetary Science Conference in Houston.

  • Saturday 22nd September Sol 46

    Posted by jbridges in Mars Science Laboratory Blog on September 22, 2012 Mankind versus Machine #1 We have taken a break to watch the JPL flypast of the Shuttle Endeavour as it is brought on the back of a Boeing 747 to Los Angeles.

  • 11th March 2016 Sol 1278

    Posted by jbridges in Mars Science Laboratory Blog on March 11, 2016 In the last few days we have been finding these rounded cm-sized nodules on eroded faces of the underlying Stimson sandstone.

  • 14th July 2014 Sol 688

    Posted by jbridges in Mars Science Laboratory Blog on July 14, 2014 In addition to driving towards the Murray Buttes gap in the dunes, and our path onto Mt. Sharp, we stop sometimes to do contact science.  The image gives an example of what this entails.

  • 27th October 2014 Sol 791

    Posted by jbridges in Mars Science Laboratory Blog on October 27, 2014 You can see from the inset on this map that we have started driving again, south towards the higher ground, though in small distances compared to some of the long ~100 m drives we did earlier in the mission.

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

Back to top
MENU