Search

15210 results for: ‘92kaifa 仿《剑速网》QQ头像 QQ皮肤 文章资讯源码帝国CMS 自带手机版✅项目合作 二开均可 TG:saolei44✅.RxHphzNWuFcFpU’

  • New investment in seismic monitoring facility at University of Leicester

    Leicester-based SEIS-UK is to benefit from new funding from Natural Environmental Research Council, as will two facilities led by the National Centre for Earth Observation (NCEO), which is based at Space Park Leicester, the University of Leicester’s space hub

  • Dr. Suzie Imber on WomenInSTEM

    Dr. Suzie Imber on WomenInSTEM

  • Reflection: So easy to say, yet so hard to do……

    Posted by Martin Coffey in Postgraduate Researcher Careers on September 26, 2018 Across a wide range of professional areas reflection is seen as a key skill.

  • Graduate teaching assistants

    Browse the contact details of the graduate teaching assistants who work, teach and research in the School of Computing and Mathematical sciences

  • jbridges: Page 25

    This blog is a record of my experiences and work during the Mars Science Laboratory mission, from the preparation, landing on August 5th 2012 Pacific Time, and onwards...I will also post updates about our other Mars work on meteorites, ExoMars and new missions.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

Back to top
MENU