Search

14251 results for: ‘溪谷软件 SDK PC官网 APP手游商店 WAP官网 推广联盟 H5平台✅项目合作 二开均可 TG:saolei44✅.kIxoPFWZCGo’

  • Saturday 18th August Sol 13

    Posted by jbridges in Mars Science Laboratory Blog on August 19, 2012 In order to keep track of time, both on Earth and Mars, a few people on the MSL team wear 2 watches.  That is a clear sign that someone at JPL is working on the MSL mission.

  • 5th August 2013 Sol 355

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing.  MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.

  • 13th June 2016 Sol 1370

    Posted by jbridges in Mars Science Laboratory Blog on June 13, 2016 Here is the Oudam drillhole and the nearby dump piles for material that has been analysed by CheMin.

  • 4th September 2015 Sol 1094

    Posted by jbridges in Mars Science Laboratory Blog on September 4, 2015 This NavCam mosaic shows the Williams outcrop in front of us, which is part of the Stimson unit.

  • 12th May 2013 Sol 272

    Posted by jbridges in Mars Science Laboratory Blog on May 12, 2013 Here is an image of the drillhole, and the tailings around it, taken by the MAHLI microimager on the robotic arm.  In the tailings pile and within the hole (it is 1.

  • 23rd May 2014 Sol 639

    Posted by jbridges in Mars Science Laboratory Blog on May 23, 2014 This MAHLI image (with a contrast stretch) shows the path ahead towards Murray Buttes and across the dark dunes to Mt. Sharp.

  • Tuesday August 14th Sol 9

    Posted by jbridges in Mars Science Laboratory Blog on August 14, 2012 Barack Obama talked to the JPL engineering team yesterday and everyone else watched a video link of this.

  • Martin Coffey: Page 2

    Postgraduate Career Development Adviser, Doctoral College Team.

  • Andrew Dunn: Page 145

    Academic Librarian.

  • Andrew Dunn: Page 215

    Academic Librarian.

Back to top
MENU