Search

17347 results for: ‘K209(PC WAP)教育咨询服务类网站pbootcms模板 教育培训出国留学机构网站源码下载✅项目合作 二开均可 TG:saolei44✅.LErQQotVLlvYk’

  • 23rd May 2014 Sol 639

    Posted by jbridges in Mars Science Laboratory Blog on May 23, 2014 This MAHLI image (with a contrast stretch) shows the path ahead towards Murray Buttes and across the dark dunes to Mt. Sharp.

  • 4th September 2015 Sol 1094

    Posted by jbridges in Mars Science Laboratory Blog on September 4, 2015 This NavCam mosaic shows the Williams outcrop in front of us, which is part of the Stimson unit.

  • 14th July 2014 Sol 688

    Posted by jbridges in Mars Science Laboratory Blog on July 14, 2014 In addition to driving towards the Murray Buttes gap in the dunes, and our path onto Mt. Sharp, we stop sometimes to do contact science.  The image gives an example of what this entails.

  • 27th October 2014 Sol 791

    Posted by jbridges in Mars Science Laboratory Blog on October 27, 2014 You can see from the inset on this map that we have started driving again, south towards the higher ground, though in small distances compared to some of the long ~100 m drives we did earlier in the mission.

  • 11th March 2016 Sol 1278

    Posted by jbridges in Mars Science Laboratory Blog on March 11, 2016 In the last few days we have been finding these rounded cm-sized nodules on eroded faces of the underlying Stimson sandstone.

  • Sunday 23rd September Sol 47

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2012 Mankind versus Machine #2 The robotic arm is over the calibration rock Jake_ Matijevic.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

  • 30th October 2013 Sol 438

    Posted by jbridges in Mars Science Laboratory Blog on October 30, 2013 We have now reached Waypoint 2 – Cooperstown, 4 km from our starting point at Bradbury Landing.

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

  • 20th May 2013 Sol 280

    Posted by jbridges in Mars Science Laboratory Blog on May 20, 2013 Here is a MAHLI image of our second drill hole at Cumberland.  Like the first drill hole it shows the difference between the reddish uppermost surface of Mars and what lies underneath.

Back to top
MENU