Search

12066 results for: ‘彩虹易支付最新升级版源码下载/BUG修复与订单投诉功能增强✅项目合作 二开均可 TG:saolei44✅.dCOZnZCgADzxYy’

  • March 3rd 2013 Sol 206

    Posted by jbridges in Mars Science Laboratory Blog on March 5, 2013 No new data or images over the last few sols.

  • Postgraduate Researcher Careers: Academic and staff blogs from the University of Leicester: Page 6

    Academic and staff blogs from the University of Leicester

  • School of Business Blog: Academic and staff blogs from the University of Leicester: Page 4

    Academic and staff blogs from the University of Leicester

  • 13th October 2015 Sol 1133

    Posted by jbridges in Mars Science Laboratory Blog on October 13, 2015 Here is the latest selfie – perhaps the best yet. It is from the Big Sky drill site (you can see the Big Sky drill hole and the drill tailings) in the lower left.

  • Monkeys and chimpanzees have created their own archaeological sites dating back hundreds of years

    Capuchin monkeys have created their own archaeological sites in Brazil, complete with nut-cracking tools that date back at least 600-700 years ago, according to recent research – and Dr Huw Barton from the University of Leicester’s School of Archaeology and Ancient History...

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

  • 6th November 2013 Sol 445

    Posted by jbridges in Mars Science Laboratory Blog on November 6, 2013 Curiosity is having a software upgrade this week, so no science operations. We are still at Cooperstown and thinking about the close up images of the outcrop layers.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • 2nd October 2013 Sol 411

    Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.

Back to top
MENU