Search
-
2nd October 2013 Sol 411
https://staffblogs.le.ac.uk/mars/2013/10/02/2nd-october-2013-sol-411/
Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.
-
Friday 14th December Sol 127
https://staffblogs.le.ac.uk/mars/2012/12/14/friday-14th-december-sol-127/
Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far. We are seeing finely layered, continuous beds, with some cross bedded layers.
-
1st May 2014 Sol 618
https://staffblogs.le.ac.uk/mars/2014/05/01/1st-may-2014-sol-618/
Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana. You can see that Red Mars is only a very thin layer on the planet.
-
5th August 2014 Sol 710
https://staffblogs.le.ac.uk/mars/2014/08/05/5th-august-2014-sol-710/
Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley. On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.
-
28th December 2015 Sol 1206
https://staffblogs.le.ac.uk/mars/2015/12/28/28th-december-2015-sol-1206/
Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days. We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.
-
4th October 2016 Sol 1480
https://staffblogs.le.ac.uk/mars/2016/10/04/4th-october-2016-sol-1480/
Posted by jbridges in Mars Science Laboratory Blog on October 4, 2016 This MAHLI mosaic view of Curiosity and Murray Butte no. 12 is where we have just been drilling Quela – the 14th drillhole on Mars.
-
February 21st 2013 Sol 194
https://staffblogs.le.ac.uk/mars/2013/02/21/february-21st-2013-sol-194/
Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...
-
9th August 2013 Sol 359
https://staffblogs.le.ac.uk/mars/2013/08/09/9th-august-2013-sol-359/
Posted by jbridges in Mars Science Laboratory Blog on August 9, 2013 Here is a map showing close to our current location. We saw a pebble bed similar to what we found near Bradbury Landing on our first drive down Peace Vallis towards Yellowknife Bay.
-
17th September 2013 Sol 397
https://staffblogs.le.ac.uk/mars/2013/09/17/17th-september-2013-sol-397/
Posted by jbridges in Mars Science Laboratory Blog on September 17, 2013 We are now doing contact science at the Darwin outcrop. The rounded clasts in the NavCam image show that it is conglomerate.
-
23rd September 2013 Sol 402
https://staffblogs.le.ac.uk/mars/2013/09/23/23rd-september-2013-sol-402/
Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data. The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.