Search
-
19th July 2016 Sol 1405
https://staffblogs.le.ac.uk/mars/2016/07/19/19th-july-2016-sol-1405/
Posted by jbridges in Mars Science Laboratory Blog on July 19, 2016 MSL is back and working as normal. This MastCam picture shows that even at this early stage of the dust season (ls = 190 ie we haven’t reached perihelion of Mars orbit yet) the crater rim is becoming obscured.
-
Andrew Dunn: Page 215
https://staffblogs.le.ac.uk/socscilibrarians/author/andrew_dunn/page/215/
Academic Librarian.
-
University urges others to support The Big Help Out volunteer drive
https://le.ac.uk/news/2023/may/big-help-out
A major Leicester institution with a proud history of supporting communities has thrown its weight behind a nationwide volunteering project which marks the Coronation of His Majesty the King.
-
2nd October 2013 Sol 411
https://staffblogs.le.ac.uk/mars/2013/10/02/2nd-october-2013-sol-411/
Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.
-
13th December 2016 Sol 1548
https://staffblogs.le.ac.uk/mars/2016/12/13/13th-december-2016-sol-1548/
Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.
-
17th July 2015 Sol 1047
https://staffblogs.le.ac.uk/mars/2015/07/17/17th-july-2015-sol-1047/
Posted by jbridges in Mars Science Laboratory Blog on July 17, 2015 The science team is considering the next drill target. ChemCam and APXS results suggest that the sediment compositions are changing within the Murray Formation, with more altered compositions.
-
13th November 2015 Sol 1164
https://staffblogs.le.ac.uk/mars/2015/11/13/13th-november-2015-sol-1164/
Posted by jbridges in Mars Science Laboratory Blog on November 13, 2015 We are nearing the next major phase of the mission – the Bagnold Dunes campaign.
-
9th August 2013 Sol 359
https://staffblogs.le.ac.uk/mars/2013/08/09/9th-august-2013-sol-359/
Posted by jbridges in Mars Science Laboratory Blog on August 9, 2013 Here is a map showing close to our current location. We saw a pebble bed similar to what we found near Bradbury Landing on our first drive down Peace Vallis towards Yellowknife Bay.
-
17th September 2013 Sol 397
https://staffblogs.le.ac.uk/mars/2013/09/17/17th-september-2013-sol-397/
Posted by jbridges in Mars Science Laboratory Blog on September 17, 2013 We are now doing contact science at the Darwin outcrop. The rounded clasts in the NavCam image show that it is conglomerate.
-
23rd September 2013 Sol 402
https://staffblogs.le.ac.uk/mars/2013/09/23/23rd-september-2013-sol-402/
Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data. The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.