Search

14052 results for: ‘京东多用户综合商城PC WAP整站带数据源码✅项目合作 二开均可 TG:saolei44✅.aPUznUzoBh’

  • 27th October 2014 Sol 791

    Posted by jbridges in Mars Science Laboratory Blog on October 27, 2014 You can see from the inset on this map that we have started driving again, south towards the higher ground, though in small distances compared to some of the long ~100 m drives we did earlier in the mission.

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

  • 20th May 2013 Sol 280

    Posted by jbridges in Mars Science Laboratory Blog on May 20, 2013 Here is a MAHLI image of our second drill hole at Cumberland.  Like the first drill hole it shows the difference between the reddish uppermost surface of Mars and what lies underneath.

  • 16th August 2016 Sol 1432

    Posted by jbridges in Mars Science Laboratory Blog on August 16, 2016 The Veins of Mars The Veins of Mars Dr Samuel Illingworth of Manchester Metropolitan University has written a poem about the sulphate veins on Mars that we have just published about in Meteoritics and...

  • 1st December 2014 Sol 825

    Posted by jbridges in Mars Science Laboratory Blog on December 1, 2014 This NavCam image shows a dusty view of Mt Sharp and its layers.  It is a sign that we are very close to summer solstice again.

  • Saturday 18th August Sol 13

    Posted by jbridges in Mars Science Laboratory Blog on August 19, 2012 In order to keep track of time, both on Earth and Mars, a few people on the MSL team wear 2 watches.  That is a clear sign that someone at JPL is working on the MSL mission.

  • July 5th 2013 Sol 324

    Posted by jbridges in Mars Science Laboratory Blog on July 5, 2013   I am visiting the French ChemCam HQ in the CNRS lab based in Toulouse.  Some of the development of ChemCam was done by the group here.

  • 5th August 2013 Sol 355

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing.  MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.

  • Sunday 23rd September Sol 47

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2012 Mankind versus Machine #2 The robotic arm is over the calibration rock Jake_ Matijevic.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

Back to top
MENU