Search

8048 results for: ‘Bakkt 区块链交易所多语言期权交易平台✅项目合作 二开均可 TG:saolei44✅.aMvWSvRBLw’

  • 12th May 2013 Sol 272

    Posted by jbridges in Mars Science Laboratory Blog on May 12, 2013 Here is an image of the drillhole, and the tailings around it, taken by the MAHLI microimager on the robotic arm.  In the tailings pile and within the hole (it is 1.

  • 23rd May 2014 Sol 639

    Posted by jbridges in Mars Science Laboratory Blog on May 23, 2014 This MAHLI image (with a contrast stretch) shows the path ahead towards Murray Buttes and across the dark dunes to Mt. Sharp.

  • 4th September 2015 Sol 1094

    Posted by jbridges in Mars Science Laboratory Blog on September 4, 2015 This NavCam mosaic shows the Williams outcrop in front of us, which is part of the Stimson unit.

  • 13th June 2016 Sol 1370

    Posted by jbridges in Mars Science Laboratory Blog on June 13, 2016 Here is the Oudam drillhole and the nearby dump piles for material that has been analysed by CheMin.

  • 1st April 2014 Sol 587

    Posted by jbridges in Mars Science Laboratory Blog on April 1, 2014 We have continued with contact science at the Square Top outcrop, with its characteristic striated upper surface, before we drive up to the Kimberley location.

  • 1st December 2014 Sol 825

    Posted by jbridges in Mars Science Laboratory Blog on December 1, 2014 This NavCam image shows a dusty view of Mt Sharp and its layers.  It is a sign that we are very close to summer solstice again.

  • Saturday 18th August Sol 13

    Posted by jbridges in Mars Science Laboratory Blog on August 19, 2012 In order to keep track of time, both on Earth and Mars, a few people on the MSL team wear 2 watches.  That is a clear sign that someone at JPL is working on the MSL mission.

  • Sunday 23rd September Sol 47

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2012 Mankind versus Machine #2 The robotic arm is over the calibration rock Jake_ Matijevic.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

  • 30th October 2013 Sol 438

    Posted by jbridges in Mars Science Laboratory Blog on October 30, 2013 We have now reached Waypoint 2 – Cooperstown, 4 km from our starting point at Bradbury Landing.

Back to top
MENU