Search

15750 results for: ‘students announcements summer graduation ceremonies and celebration event update’

  • 27th April 2015 Sol 968

    Posted by jbridges in Mars Science Laboratory Blog on April 27, 2015 We are situated at Mt. Shields, having driven along Logan’s Run.  I am Geo Science team Lead today, and we are preparing a 2 sol plan.

  • 19th August 2015 Sol 1079

    Posted by jbridges in Mars Science Laboratory Blog on August 19, 2015 This fantastic new selfie has just been returned.  It is a mosaic of images from MAHLI taken over our recent drill site at Buckskin. Buckskin has turned out to be very silica rich and very hydrated.

  • 12th September 2015 Sol 1101

    Posted by jbridges in Mars Science Laboratory Blog on September 12, 2015 We have a stunning new view of Mt Sharp and the channels running off it. As we drive into the canyons after the Bagnold dunes campaign, we will see high cliffs of sedimentary rocks surrounding us.

  • 22nd September 2015 Sol 1112

    Posted by jbridges in Mars Science Laboratory Blog on September 22, 2015 I have been Geo Science Theme Lead GSTL for the last two sol plan (sols 1112-1113). One of the main topics we have been discussing is where to drill next.

  • 5th December 2013 Sol 474

    Posted by jbridges in Mars Science Laboratory Blog on December 5, 2013 We have paused to do some contact science, using the robotic arm to use APXS on the local rocks.

  • 21st December 2016 Sol 1556

    Posted by jbridges in Mars Science Laboratory Blog on December 21, 2016 I am Geo-Min Science theme lead for todays plan.  As usual after 4 years of operations we are doing 3 sols of planning at one go.

  • 19th January 2017 Sol 1584

    Posted by jbridges in Mars Science Laboratory Blog on January 19, 2017 We have found another (the 4th) meteorite.  The fist sized sample called Ames_Knob – which was analysed by ChemCam – turns out to be composed of Fe and Ni metal.

  • 6th February 2017 Sol 1602

    Posted by jbridges in Mars Science Laboratory Blog on February 6, 2017 We have started the second part of the Bagnold Dunes campaign. This NavCam image shows Bagnold dunes in front of Ireson Hill. This first in the current dunes campaign is Called Mapleton.

  • 6th March 2015 Sol 918

    Posted by jbridges in Mars Science Laboratory Blog on March 6, 2015 We are in the middle of preparing a 3 sol plan, in the final stages of the Pahrump campaign.

  • 8th May 2015 Sol 979

    Posted by jbridges in Mars Science Laboratory Blog on May 8, 2015 This Mastcam panorama shows our current location at Mt. Shields and our route on to Mt Sharp via Logan’s Pass.  We are planning contact science on the outcrops on the lower part of Mt. Shields.

Back to top
MENU