Search

13030 results for: ‘小霸王站群池蜘蛛池v5.42 很牛逼的蜘蛛池程序✅项目合作 二开均可 TG:saolei44✅.nrQaLPYqFYSY’

  • 9th August 2013 Sol 359

    Posted by jbridges in Mars Science Laboratory Blog on August 9, 2013 Here is a map showing close to our current location. We saw a pebble bed similar to what we found near Bradbury Landing on our first drive down Peace Vallis towards Yellowknife Bay.

  • 17th September 2013 Sol 397

    Posted by jbridges in Mars Science Laboratory Blog on September 17, 2013 We are now doing contact science at the Darwin outcrop.  The rounded clasts in the NavCam image show that it is conglomerate.

  • 23rd September 2013 Sol 402

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data.  The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.

  • February 16th 2013 Sol 189

    Posted by jbridges in Mars Science Laboratory Blog on February 16, 2013 This image shows the row of 10 laser spots shot by ChemCam in the drill tailings.   This is one of our first analyses prior to the analysis of material by CheMin and SAM.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 11th September 2014 Sol 746

    Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission.  This area is called the Pahrump Hills.

  • 3rd May 2013 Sol 263

    Posted by jbridges in Mars Science Laboratory Blog on May 3, 2013 Our first image has come back after conjunction.  Here is the Chemcam remote microimager (RMI) of our titanium calibration target.

  • April 9th 2013 Sol 240

    Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks.  We are parked at the John Klein site during this time.

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • 14th January 2014 Sol 868

    Posted by jbridges in Mars Science Laboratory Blog on January 14, 2015 We have started the drilling activities at Pahrump (Mojahave outcrop).  This MAHLI image shows that the initial minidrill attempt turned up some unweathered fine grained sediment.

Back to top
MENU