Search

9781 results for: ‘asp.net354学生管理系统毕业设计✅项目合作 二开均可 TG:saolei44✅.oYqGiZecYhYGmg’

  • 13th June 2016 Sol 1370

    Posted by jbridges in Mars Science Laboratory Blog on June 13, 2016 Here is the Oudam drillhole and the nearby dump piles for material that has been analysed by CheMin.

  • 1st April 2014 Sol 587

    Posted by jbridges in Mars Science Laboratory Blog on April 1, 2014 We have continued with contact science at the Square Top outcrop, with its characteristic striated upper surface, before we drive up to the Kimberley location.

  • 1st December 2014 Sol 825

    Posted by jbridges in Mars Science Laboratory Blog on December 1, 2014 This NavCam image shows a dusty view of Mt Sharp and its layers.  It is a sign that we are very close to summer solstice again.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

  • 30th October 2013 Sol 438

    Posted by jbridges in Mars Science Laboratory Blog on October 30, 2013 We have now reached Waypoint 2 – Cooperstown, 4 km from our starting point at Bradbury Landing.

  • 8th October 2015 Sol 1128

    Posted by jbridges in Mars Science Laboratory Blog on October 8, 2015 This MAHLI image (taken at nighttime and illuminated by LEDs)  shows the precision of the ChemCam LIBS shooting at about 2.5 m distance from the ChemCam on the mast.

  • 13th October 2015 Sol 1133

    Posted by jbridges in Mars Science Laboratory Blog on October 13, 2015 Here is the latest selfie – perhaps the best yet. It is from the Big Sky drill site (you can see the Big Sky drill hole and the drill tailings) in the lower left.

  • July 5th 2013 Sol 324

    Posted by jbridges in Mars Science Laboratory Blog on July 5, 2013   I am visiting the French ChemCam HQ in the CNRS lab based in Toulouse.  Some of the development of ChemCam was done by the group here.

  • 17th February 2014 Sol 545

    Posted by jbridges in Mars Science Laboratory Blog on February 17, 2014 As we approach a full martian year (669 sols) we have travelled about 5 km.  There is fine tuning to be done on the route to get us relatively quickly to the clay and iron oxide concentrations in Mt.

  • 24th April 2016 Sol 1322

    Posted by jbridges in Mars Science Laboratory Blog on April 24, 2016 We have just completed our latest drillhole at Lubango.

Back to top
MENU