Search

14439 results for: ‘开源全新开源源码Vue3 TS的前后台分离的开发平台源码✅项目合作 二开均可 TG:saolei44✅.LdShbNlbEKMGSxa’

  • 23rd September 2013 Sol 402

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data.  The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.

  • February 16th 2013 Sol 189

    Posted by jbridges in Mars Science Laboratory Blog on February 16, 2013 This image shows the row of 10 laser spots shot by ChemCam in the drill tailings.   This is one of our first analyses prior to the analysis of material by CheMin and SAM.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • April 9th 2013 Sol 240

    Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks.  We are parked at the John Klein site during this time.

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 11th September 2014 Sol 746

    Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission.  This area is called the Pahrump Hills.

  • 3rd May 2013 Sol 263

    Posted by jbridges in Mars Science Laboratory Blog on May 3, 2013 Our first image has come back after conjunction.  Here is the Chemcam remote microimager (RMI) of our titanium calibration target.

Back to top
MENU