Search

10195 results for: ‘2023全新个人免签约支付系统PHP源码 | 码支付系统 | ThinkPHP6框架 | 全开源✅项目合作 二开均可 TG:saolei44✅.eWWGvkdrhff’

  • 9th October 2014 Sol 774

    Posted by jbridges in Mars Science Laboratory Blog on October 9, 2014 This is a night time MAHLI image of the Pahrump drillhole , illuminated by the LEDs.

  • 26th May 2016 Sol 1352

    Posted by jbridges in Mars Science Laboratory Blog on May 26, 2016 We are studying an area called Fracture Town. The aim is to follow up identification of opal to check the extent to which silica has been remobilised by fluids in the sediments.

  • Monday 24th September Sol 48

    Posted by jbridges in Mars Science Laboratory Blog on September 24, 2012 Mankind versus Machine #3 We visit the Mars Yard in JPL where the Curiosity engineering model is tested over rocky terrains.

  • 30th July 2015 Sol 1059

    Posted by jbridges in Mars Science Laboratory Blog on July 30, 2015 We have started drilling at Belkin, first a minidrill hole before the main drill hole.  Belkin has been chosen because this sedimentary horizon  has some very high silica enrichments.

  • 14th August 2013 Sol 363

    Posted by jbridges in Mars Science Laboratory Blog on August 14, 2013 We have put a sample from the Cumberland drill hole into SAM for more isotopic measurements.  The sample had been cached within the robotic arm’s turret.

  • 8th January 2014 Sol 506

    Posted by jbridges in Mars Science Laboratory Blog on January 8, 2014 Its Stargazing Live at University of Leicester today.

  • February 27th 2013 Sol 200

    Posted by jbridges in Mars Science Laboratory Blog on February 27, 2013 We now have material within Curiosity for the SAM mass spectrometer and the CheMin X-ray Diffraction.

  • 20th September 2016 Sol 1466

    Posted by jbridges in Mars Science Laboratory Blog on September 20, 2016 We have got down a new self portrait of Curiosity from MAHLI.  This shows the Murray Butte number 12 – where we have just been drilling – in the ChemCam mirror.

  • February 2nd 2013 Sol 176

    Posted by jbridges in Mars Science Laboratory Blog on February 2, 2013 The rover planners are testing the drill by touching 4 points around the chosen drill site and testing the drill action, but not with the full force that the final drill action will use.

  • 1st November 2013 Sol 439

    Posted by jbridges in Mars Science Laboratory Blog on November 1, 2013 We have driven right up to the Cooperstown outcrop.  The rdige (a few tens of cm high) is composed of a resistant layer of sedimentary rock.

Back to top
MENU