Search
-
26th June 2013 Sol 316
https://staffblogs.le.ac.uk/mars/2013/06/26/26th-june-2013-sol-316/
Posted by jbridges in Mars Science Laboratory Blog on June 26, 2013 Curiosity Inspecting Shaler. This HazCam image shows our location at Shaler and the tracks left as we have manoeuvred along the outcrop to look at the planar and cross bedding structures.
-
February 2nd 2013 Sol 176
https://staffblogs.le.ac.uk/mars/2013/02/02/february-2nd-2013-sol-176/
Posted by jbridges in Mars Science Laboratory Blog on February 2, 2013 The rover planners are testing the drill by touching 4 points around the chosen drill site and testing the drill action, but not with the full force that the final drill action will use.
-
1st November 2013 Sol 439
https://staffblogs.le.ac.uk/mars/2013/11/01/1st-november-2013-sol-439/
Posted by jbridges in Mars Science Laboratory Blog on November 1, 2013 We have driven right up to the Cooperstown outcrop. The rdige (a few tens of cm high) is composed of a resistant layer of sedimentary rock.
-
20th September 2016 Sol 1466
https://staffblogs.le.ac.uk/mars/2016/09/20/20th-september-2016-sol-1466/
Posted by jbridges in Mars Science Laboratory Blog on September 20, 2016 We have got down a new self portrait of Curiosity from MAHLI. This shows the Murray Butte number 12 – where we have just been drilling – in the ChemCam mirror.
-
14th September 2013 Sol 393
https://staffblogs.le.ac.uk/mars/2013/09/14/14th-september-2013-sol-393/
Posted by jbridges in Mars Science Laboratory Blog on September 14, 2013 We have reached Waypoint 1, our first stopoff point on the route to Mount Sharp. The Hazcam image shows Mt. Sharp in the distance and rock outcrop in the foreground.
-
5th January 2014 Sol 503
https://staffblogs.le.ac.uk/mars/2014/01/05/5th-january-2014-sol-505/
Posted by jbridges in Mars Science Laboratory Blog on January 5, 2014 After the break over the holidays we are back analysing and driving. It is small drives so far.
-
21st August 2014 Sol 726
https://staffblogs.le.ac.uk/mars/2014/08/21/21st-august-2014-sol-726/
Posted by jbridges in Mars Science Laboratory Blog on August 21, 2014 As we were performing a minidrill – thats the smaller test hole prior to a large full drill hole – the prongs that keep the turret and drill steady slipped by a small amount..
-
8th May 2015 Sol 979
https://staffblogs.le.ac.uk/mars/2015/05/08/8th-may-2015-sol-979/
Posted by jbridges in Mars Science Laboratory Blog on May 8, 2015 This Mastcam panorama shows our current location at Mt. Shields and our route on to Mt Sharp via Logan’s Pass. We are planning contact science on the outcrops on the lower part of Mt. Shields.
-
30th July 2015 Sol 1059
https://staffblogs.le.ac.uk/mars/2015/07/30/30th-july-2015-sol-1059/
Posted by jbridges in Mars Science Laboratory Blog on July 30, 2015 We have started drilling at Belkin, first a minidrill hole before the main drill hole. Belkin has been chosen because this sedimentary horizon has some very high silica enrichments.
-
12th September 2015 Sol 1101
https://staffblogs.le.ac.uk/mars/2015/09/12/12th-september-2015-sol-1101/
Posted by jbridges in Mars Science Laboratory Blog on September 12, 2015 We have a stunning new view of Mt Sharp and the channels running off it. As we drive into the canyons after the Bagnold dunes campaign, we will see high cliffs of sedimentary rocks surrounding us.