Search

13282 results for: ‘苹果CMS V10自适应清新影视模版苹果CMS V10商业模版✅项目合作 二开均可 TG:saolei44✅.PzPoGoziChjqW’

  • Tuesday August 14th Sol 9

    Posted by jbridges in Mars Science Laboratory Blog on August 14, 2012 Barack Obama talked to the JPL engineering team yesterday and everyone else watched a video link of this.

  • 5th August 2013 Sol 355

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing.  MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

  • 13th October 2015 Sol 1133

    Posted by jbridges in Mars Science Laboratory Blog on October 13, 2015 Here is the latest selfie – perhaps the best yet. It is from the Big Sky drill site (you can see the Big Sky drill hole and the drill tailings) in the lower left.

  • 1st April 2014 Sol 587

    Posted by jbridges in Mars Science Laboratory Blog on April 1, 2014 We have continued with contact science at the Square Top outcrop, with its characteristic striated upper surface, before we drive up to the Kimberley location.

  • 1st December 2014 Sol 825

    Posted by jbridges in Mars Science Laboratory Blog on December 1, 2014 This NavCam image shows a dusty view of Mt Sharp and its layers.  It is a sign that we are very close to summer solstice again.

  • 14th July 2014 Sol 688

    Posted by jbridges in Mars Science Laboratory Blog on July 14, 2014 In addition to driving towards the Murray Buttes gap in the dunes, and our path onto Mt. Sharp, we stop sometimes to do contact science.  The image gives an example of what this entails.

  • Tuesday 25th September Sol 49

    Posted by jbridges in Mars Science Laboratory Blog on September 25, 2012 We are now getting a combination of the high resolution MAHLI images, APXS and ChemCam compositional data and the other camera images.

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

  • 19th January 2014 Sol 517

    Posted by jbridges in Mars Science Laboratory Blog on January 19, 2014 On Earth rocks that are as ancient as those we are studying on Mars have been destroyed by the tectonic recycling process or heavily metamorphosed.

Back to top
MENU