Search

13360 results for: ‘杰奇V2.20仿《不朽文学网》原创小说网站系统源码(采集 支付 VIP)✅项目合作 二开均可 TG:saolei44✅.gKRQpKcXknOCdXI’

  • 1st November 2013 Sol 439

    Posted by jbridges in Mars Science Laboratory Blog on November 1, 2013 We have driven right up to the Cooperstown outcrop.  The rdige (a few tens of cm high) is composed of a resistant layer of sedimentary rock.

  • 26th June 2013 Sol 316

    Posted by jbridges in Mars Science Laboratory Blog on June 26, 2013 Curiosity Inspecting Shaler. This HazCam image shows our location at Shaler and the tracks left as we have manoeuvred along the outcrop to look at the planar and cross bedding structures.

  • 21st December 2016 Sol 1556

    Posted by jbridges in Mars Science Laboratory Blog on December 21, 2016 I am Geo-Min Science theme lead for todays plan.  As usual after 4 years of operations we are doing 3 sols of planning at one go.

  • 19th January 2017 Sol 1584

    Posted by jbridges in Mars Science Laboratory Blog on January 19, 2017 We have found another (the 4th) meteorite.  The fist sized sample called Ames_Knob – which was analysed by ChemCam – turns out to be composed of Fe and Ni metal.

  • Solar System samples touch down in Leicester

    Samples from other worlds have touched down in Leicester, to be analysed by space scientists studying the building blocks of our Solar System.

  • 11th March 2016 Sol 1278

    Posted by jbridges in Mars Science Laboratory Blog on March 11, 2016 In the last few days we have been finding these rounded cm-sized nodules on eroded faces of the underlying Stimson sandstone.

  • July 5th 2013 Sol 324

    Posted by jbridges in Mars Science Laboratory Blog on July 5, 2013   I am visiting the French ChemCam HQ in the CNRS lab based in Toulouse.  Some of the development of ChemCam was done by the group here.

  • 17th February 2014 Sol 545

    Posted by jbridges in Mars Science Laboratory Blog on February 17, 2014 As we approach a full martian year (669 sols) we have travelled about 5 km.  There is fine tuning to be done on the route to get us relatively quickly to the clay and iron oxide concentrations in Mt.

  • MBiolSci Research Project (Cancer Cell Biology)

    Module code: BS4006 This module comprises a full-time, 4 month research project placement: 3 months of lab work and then 1 month for writing the dissertation and project presentation.

  • Thursday 20th September Sol 44

    Posted by jbridges in Mars Science Laboratory Blog on September 20, 2012 The image shows the shadows of Curiosity’s robotic arm and mast approaching our calibration rock.

Back to top
MENU