Search

7071 results for: ‘全网首发Metamask小狐狸盗助记词钱包源码附搭建教程✅项目合作 二开均可 TG:saolei44✅.TkyJadtLXgD’

  • 15th June 2015 Sol 1015

    Posted by jbridges in Mars Science Laboratory Blog on June 15, 2015 Planetary conjunction – with no MSL operations – is an ideal time for a team meeting.

  • 14th October 2013 Sol 424

    Posted by jbridges in Mars Science Laboratory Blog on October 14, 2013 The noon to pre-dawn temperature variation at Gale Crater can be up to 90 degrees centigrade.   This MastCam image shows the effects of this extreme temperature variation.

  • 29th November 2016 Sol 1534

    Posted by jbridges in Mars Science Laboratory Blog on January 1, 1970 We have started our 19th drill or scoop.  Curiosity now aims to drill at regular elevation intervals (25 m) as we progress up through the Murray formation.

  • Monday 13th August Sol 7

    Posted by jbridges in Mars Science Laboratory Blog on August 12, 2012 One of the things that Curiosity carries is 1.2 million names from 246 countries together with student essays and letters from  the jpl engineers who constructed Curiosity.

  • Wednesday 15th August Sol 10

    Posted by jbridges in Mars Science Laboratory Blog on August 16, 2012 As we study images of places never seen before I get the full  sense of the excitement of exploration that early explorers on Earth must have felt as they encountered new lands .

  • Tuesday 2nd October Sol 56

    Posted by jbridges in Mars Science Laboratory Blog on October 2, 2012 We are getting excellent close up images with MAHLI of the rocks underneath us at the rim of Glenelg.  Soon we will pause to scoop a fine-grained sample for our XRD experiment.

  • 24th April 2016 Sol 1322

    Posted by jbridges in Mars Science Laboratory Blog on April 24, 2016 We have just completed our latest drillhole at Lubango.

  • Saturday 18th August Sol 13

    Posted by jbridges in Mars Science Laboratory Blog on August 19, 2012 In order to keep track of time, both on Earth and Mars, a few people on the MSL team wear 2 watches.  That is a clear sign that someone at JPL is working on the MSL mission.

  • March 30th 2013 Sol 231

    Posted by jbridges in Mars Science Laboratory Blog on March 30, 2013 We are now back to full operations after the software problems, and getting in observations prior to the planetary conjunction.

  • 5th August 2013 Sol 355

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing.  MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.

Back to top
MENU