Search

12943 results for: ‘正版授权 高仿DM456.COM动漫网站程序源码 终身版✅项目合作 二开均可 TG:saolei44✅.SNEZWbZjOq’

  • Thursday 20th September Sol 44

    Posted by jbridges in Mars Science Laboratory Blog on September 20, 2012 The image shows the shadows of Curiosity’s robotic arm and mast approaching our calibration rock.

  • 29th April 2013 Sol 260

    Posted by jbridges in Mars Science Laboratory Blog on April 29, 2013 Mars is not out of conjunction yet, so, we are only getting short, small data volumes of communication from Curiosity.

  • 13th November 2013 Sol 453

    Posted by jbridges in Mars Science Laboratory Blog on November 13, 2013 We have restarted science operations again after the software upload taking longer than expected.

  • 15th February 2016 Sol 1254

    Posted by jbridges in Mars Science Laboratory Blog on February 15, 2016 We have now started driving away from the main Namib dunes, and onto the Naukluft Plateau.

  • 9th May 2016 Sol 1336

    Posted by jbridges in Mars Science Laboratory Blog on May 9, 2016 We have followed up the Lubango drillhole quickly with another one at a nearby Stimson aeolian sandstone outcrop (Okoruso).  The idea is to compare unaltered sandstone (Okoruso) to altered Lubango.

  • 12th July 2013 Sol 332

    Posted by jbridges in Mars Science Laboratory Blog on July 12, 2013 Operations week at Toulouse is coming to an end and is switching back to the Lawrence Livermore Laboratory.  In Toulouse the opeations centre is housed by the French Space Agency CNES.

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

Back to top
MENU