Search
-
March 30th 2013 Sol 231
https://staffblogs.le.ac.uk/mars/2013/03/30/march-30th-2013-sol-231/
Posted by jbridges in Mars Science Laboratory Blog on March 30, 2013 We are now back to full operations after the software problems, and getting in observations prior to the planetary conjunction.
-
5th August 2013 Sol 355
https://staffblogs.le.ac.uk/mars/2013/08/05/5th-august-2013-sol-355/
Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing. MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.
-
Saturday 18th August Sol 13
https://staffblogs.le.ac.uk/mars/2012/08/19/saturday-18th-august-sol-13/
Posted by jbridges in Mars Science Laboratory Blog on August 19, 2012 In order to keep track of time, both on Earth and Mars, a few people on the MSL team wear 2 watches. That is a clear sign that someone at JPL is working on the MSL mission.
-
12th May 2013 Sol 272
https://staffblogs.le.ac.uk/mars/2013/05/12/12th-may-2013-sol-272/
Posted by jbridges in Mars Science Laboratory Blog on May 12, 2013 Here is an image of the drillhole, and the tailings around it, taken by the MAHLI microimager on the robotic arm. In the tailings pile and within the hole (it is 1.
-
23rd May 2014 Sol 639
https://staffblogs.le.ac.uk/mars/2014/05/23/23rd-may-2014-sol-639/
Posted by jbridges in Mars Science Laboratory Blog on May 23, 2014 This MAHLI image (with a contrast stretch) shows the path ahead towards Murray Buttes and across the dark dunes to Mt. Sharp.
-
29th November 2016 Sol 1534
https://staffblogs.le.ac.uk/mars/2016/11/29/29th-november-2016-sol-1534-1/
Posted by jbridges in Mars Science Laboratory Blog on November 29, 2016 We have started our 19th drill or scoop. Curiosity now aims to drill at regular elevation intervals (25 m) as we progress up through the Murray formation.
-
13th June 2016 Sol 1370
https://staffblogs.le.ac.uk/mars/2016/06/13/13th-june-2016-sol-1370/
Posted by jbridges in Mars Science Laboratory Blog on June 13, 2016 Here is the Oudam drillhole and the nearby dump piles for material that has been analysed by CheMin.
-
Pioneering university-led project helps Afghan women adapt to life in Leicester
https://le.ac.uk/news/2022/february/afghan-course
Philip Horspool, Director of the English Language Teaching Unit (ELTU) at the University of Leicester, said: “Language is one of the many challenges facing those who leave their country.
-
Projects
https://le.ac.uk/celi/projects
The CELI team project has the objective to better understand GP as a tool for the substantive openness of the EU legal order as well as for cross-fertilization and coherence of legal orders.
-
DOCK businesses targeted for university-business collaborations
https://le.ac.uk/news/2015/july/dock-businesses-targeted-for-university-business-collaborations
As part of a drive to encourage collaborations between local innovation businesses and the University, the Enterprise and Business Development Office (EBDO) held a successful event at DOCK recently (29 June).