Search

13484 results for: ‘最新SF授权系统源码 全开源无加密v5.2版本✅项目合作 二开均可 TG:saolei44✅.QPHqjDSjGxp’

  • 13th April 2015 Sol 955

    Posted by jbridges in Mars Science Laboratory Blog on April 13, 2015 We have left Garden City and are commencing a week of driving.  This also marks 10 km on the odometer, at up to 100 m a day we can travel quite quickly.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • 27th November 2015 Sol 1176

    Posted by jbridges in Mars Science Laboratory Blog on November 27, 2015 We have reached the Bagnold Dunes and are driving through a gap. The dark colour is due to the iron and magnesium-rich composition  of the sand grains (minerals like olivine and pyroxene).

  • 6th August 2013 Sol 356

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2013 First Birthday gateaux at CNES, Toulouse.

  • Wednesday 14th Nov 2012 Sol 98

    Posted by jbridges in Mars Science Laboratory Blog on November 14, 2012 With its APXS (Alpha Particle X-ray Spectrometer) instrument on the robotic arm of Curiosity is measuring the composition of rocks and soil at Rocknest.

  • 5th January 2014 Sol 503

    Posted by jbridges in Mars Science Laboratory Blog on January 5, 2014 After the break over the holidays we are back analysing and driving. It is small drives so far.

  • 24th September 2014 Sol 758

    Posted by jbridges in Mars Science Laboratory Blog on September 24, 2014 We are drilling at Pahrump (named after an old Shoshone, native American settlement in what is now Nevada).

  • 10th April 2014 Sol 596

    Posted by jbridges in Mars Science Laboratory Blog on April 10, 2014 Here is a NavCam image of the Kimberley, with Mount Remarkable the small hill (less than 5 m high) which we are pointing towards.

  • MBiolSci Research Project (Cancer Cell Biology)

    Module code: BS4006 This module comprises a full-time, 4 month research project placement: 3 months of lab work and then 1 month for writing the dissertation and project presentation.

Back to top
MENU