Search
-
13th December 2016 Sol 1548
https://staffblogs.le.ac.uk/mars/2016/12/13/13th-december-2016-sol-1548/
Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.
-
Saturday 5th August Landing Sequence
https://staffblogs.le.ac.uk/mars/2012/08/06/saturday-5th-august-landing-sequence/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 10.15 pm. Cruise stage separation successful. Spin down of the aeroshell successful. Nominal ‘heartbeat’ tones from Curiosity. 5.4 km/s and speeding up 6 minutes from atmospheric entry.
-
Landing
https://staffblogs.le.ac.uk/mars/2012/08/06/landing/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 Its down – Landed ! The first images are already being sent back via Odyssey. They are Hazcam images, showing a shadow cast by Curiosity on the Gale surface.
-
Sol 1 First Image of Mt. Sharp
https://staffblogs.le.ac.uk/mars/2012/08/07/sol-0-first-image-of-mt-sharp/
Posted by jbridges in Mars Science Laboratory Blog on August 7, 2012 First Image of the 5.5 km high Mt. Sharp (HazCam), the ultimate target of Curiosity. Two of the Curiosity 50 cm diameter wheels are visible in the foreground.
-
Saturday 5th August Landing Sequence
https://staffblogs.le.ac.uk/mars/2012/08/06/saturday-5th-august-landing-sequence-1/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 Nominal tones received from MSL. Target location estimated 230 m from centre of ellipse in current trajectory. 10.25 pm Atmospheric entry has occurred. Now 7 minutes to go. Getting very quiet in the room.
-
Sol 0 Monday 6th August
https://staffblogs.le.ac.uk/mars/2012/08/06/sol-0-monday-6th-august/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.
-
February 21st 2013 Sol 194
https://staffblogs.le.ac.uk/mars/2013/02/21/february-21st-2013-sol-194/
Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...
-
6th July 2016 Sol 1392
https://staffblogs.le.ac.uk/mars/2016/07/06/6th-july-2016-sol-1392/
Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.
-
10th January 2014 Sol 509
https://staffblogs.le.ac.uk/mars/2014/01/10/january-10th-2014-sol-509/
Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.
-
28th December 2015 Sol 1206
https://staffblogs.le.ac.uk/mars/2015/12/28/28th-december-2015-sol-1206/
Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days. We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.