Search
-
9th September 2016 Sol 1455
https://staffblogs.le.ac.uk/mars/2016/09/09/9th-september-2016-sol-1455/
Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes. These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.
-
13th December 2016 Sol 1548
https://staffblogs.le.ac.uk/mars/2016/12/13/13th-december-2016-sol-1548/
Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.
-
1st May 2014 Sol 618
https://staffblogs.le.ac.uk/mars/2014/05/01/1st-may-2014-sol-618/
Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana. You can see that Red Mars is only a very thin layer on the planet.
-
5th August 2014 Sol 710
https://staffblogs.le.ac.uk/mars/2014/08/05/5th-august-2014-sol-710/
Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley. On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.
-
15th August 2014 Sol 720
https://staffblogs.le.ac.uk/mars/2014/08/15/15th-august-2014-sol-720/
Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.
-
21st January 2015 Sol 875
https://staffblogs.le.ac.uk/mars/2015/01/21/21st-january-2015-sol-875/
Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead. Soon we will recommence the drilling campaign.
-
February 21st 2013 Sol 194
https://staffblogs.le.ac.uk/mars/2013/02/21/february-21st-2013-sol-194/
Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...
-
6th July 2016 Sol 1392
https://staffblogs.le.ac.uk/mars/2016/07/06/6th-july-2016-sol-1392/
Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.
-
19th January 2014 Sol 517
https://staffblogs.le.ac.uk/mars/2014/01/19/19th-january-2014-sol-517/
Posted by jbridges in Mars Science Laboratory Blog on January 19, 2014 On Earth rocks that are as ancient as those we are studying on Mars have been destroyed by the tectonic recycling process or heavily metamorphosed.
-
Historic England to view work on preserving iconic Engineering Building
https://le.ac.uk/news/2016/october/historic-england-to-view-work-on-preserving-iconic-engineering-building
Painstaking work to replace the iconic roof of our historic Engineering Building is to be examined by heritage experts this week.