Search

12994 results for: ‘毕设ssm468基于SSM的小码创客教育教学资源库的 vue毕业设计✅项目合作 二开均可 TG:saolei44✅.GUAfPZZsFLmLsYI’

  • 1st May 2014 Sol 618

    Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana.  You can see that Red Mars is only a very thin layer on the planet.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

  • Wednesday 15th August Sol 10

    Posted by jbridges in Mars Science Laboratory Blog on August 16, 2012 As we study images of places never seen before I get the full  sense of the excitement of exploration that early explorers on Earth must have felt as they encountered new lands .

  • Tuesday August 14th Sol 9

    Posted by jbridges in Mars Science Laboratory Blog on August 14, 2012 Barack Obama talked to the JPL engineering team yesterday and everyone else watched a video link of this.

  • 5th August 2013 Sol 355

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2013 We are just about at the one Earth year anniversary of our landing.  MSL Landing was on the 5th August Pacific time and about 6 am, 6th August British Summertime.

  • 12th June 2013 Sol 302

    Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.

Back to top
MENU