Search

15135 results for: ‘价值6000的USDT竞猜盘源码 时间盘源码 多语言|带包赔✅项目合作 二开均可 TG:saolei44✅.iuDrSIIBOkIKFz’

  • 23rd February 2015 Sol 907

    Posted by jbridges in Mars Science Laboratory Blog on February 23, 2015 Our next drill target is Telegraph_Peak.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

  • MBiolSci Research Project (Cancer Cell Biology)

    Module code: BS4006 This module comprises a full-time, 4 month research project placement: 3 months of lab work and then 1 month for writing the dissertation and project presentation.

  • Physics students take off

    David Jessop, Jamie Macquillin and Lewis Jackson were selected for the trip alongside 20 other students from across Europe.

Back to top
MENU