Search

14225 results for: ‘文章网站系统源码 织梦模版 仿励志一生lz13.cn带数据 织梦源码✅项目合作 二开均可 TG:saolei44✅.rDhDWeTAigDuue’

  • 15th May 2014 Sol 630

    Posted by jbridges in Mars Science Laboratory Blog on May 15, 2014 As you can see from this NavCam image we are now driving away from Mt Remarkable.

  • Sunday 3rd September Sol 27

    Posted by jbridges in Mars Science Laboratory Blog on September 3, 2012 We have had our first day off, done by planning two sols at once.  In the meantime we discuss the results so far and enjoy some of the NavCam images from Sol 26.

  • Solar System samples touch down in Leicester

    Samples from other worlds have touched down in Leicester, to be analysed by space scientists studying the building blocks of our Solar System.

  • 17th July 2015 Sol 1047

    Posted by jbridges in Mars Science Laboratory Blog on July 17, 2015 The science team is considering the next drill target. ChemCam and APXS results suggest that the sediment compositions are changing within the Murray Formation, with more altered compositions.

  • 13th April 2015 Sol 955

    Posted by jbridges in Mars Science Laboratory Blog on April 13, 2015 We have left Garden City and are commencing a week of driving.  This also marks 10 km on the odometer, at up to 100 m a day we can travel quite quickly.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 1st May 2014 Sol 618

    Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana.  You can see that Red Mars is only a very thin layer on the planet.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

Back to top
MENU