Search
-
February 21st 2013 Sol 194
https://staffblogs.le.ac.uk/mars/2013/02/21/february-21st-2013-sol-194/
Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...
-
6th July 2016 Sol 1392
https://staffblogs.le.ac.uk/mars/2016/07/06/6th-july-2016-sol-1392/
Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.
-
April 9th 2013 Sol 240
https://staffblogs.le.ac.uk/mars/2013/04/09/april-9th-2013-sol-240/
Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks. We are parked at the John Klein site during this time.
-
17th January 2016 Sol 1226
https://staffblogs.le.ac.uk/mars/2016/01/17/17th-january-2016-sol-1226/
Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.
-
29th January 2016 Sol 1238
https://staffblogs.le.ac.uk/mars/2016/01/29/29th-january-2016-sol-1238/
Posted by jbridges in Mars Science Laboratory Blog on January 29, 2016 Here is MAHLI’s selfie of Curiosity at work on the Hebron part of the Namib dune. Its a mosaic of 57 images.
-
3rd May 2013 Sol 263
https://staffblogs.le.ac.uk/mars/2013/05/03/3rd-may-2013-sol-263/
Posted by jbridges in Mars Science Laboratory Blog on May 3, 2013 Our first image has come back after conjunction. Here is the Chemcam remote microimager (RMI) of our titanium calibration target.
-
5th April 2017 Sol 1658
https://staffblogs.le.ac.uk/mars/2017/04/05/5th-april-2017-sol-1658/
Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.
-
21st January 2015 Sol 875
https://staffblogs.le.ac.uk/mars/2015/01/21/21st-january-2015-sol-875/
Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead. Soon we will recommence the drilling campaign.
-
19th July 2016 Sol 1405
https://staffblogs.le.ac.uk/mars/2016/07/19/19th-july-2016-sol-1405/
Posted by jbridges in Mars Science Laboratory Blog on July 19, 2016 MSL is back and working as normal. This MastCam picture shows that even at this early stage of the dust season (ls = 190 ie we haven’t reached perihelion of Mars orbit yet) the crater rim is becoming obscured.
-
12th August 2016 Sol 1428
https://staffblogs.le.ac.uk/mars/2016/08/12/12th-august-2016-sol-1428/
Posted by jbridges in Mars Science Laboratory Blog on August 12, 2016 Our latest drill hole – Marimba – has a distinctly reddish colour. This probably means it has a lot of ferric oxide in it.