Search

9783 results for: ‘ASP.NET校园新闻管理系统源码✅项目合作 二开均可 TG:saolei44✅.bFlOEhXLke’

  • 31st December 2014 Sol 854

    Posted by jbridges in Mars Science Laboratory Blog on December 31, 2014 We are continuing the Pahrump localities looped drive. MSL is not working full time over the holidays but we had a ‘3-sol’ plan on the 29th December.  I was the Geo Science Theme Lead for the day.

  • New drugs to prevent tuberculosis could be developed thanks to this novel cell wall breakthrough

    Hero tuberculosis Mycobacterium tuberculosisis|Research has identified a novel regulatory mechanism, which when deactivated, results in the death of the life-threatening pathogen.

  • 25th April 2014 Sol 611

    Posted by jbridges in Mars Science Laboratory Blog on April 25, 2014 Here is the chosen drill site – Windjana (named after a famous set of rocks in W. Australia which show ancient paintings).

  • Tuesday 20th Nov. Sol 104

    Posted by jbridges in Mars Science Laboratory Blog on November 20, 2012 We have moved from Rocknest where our analyses of soil, rocks and atmosphere are complete.  We have a lot of data to examine.

  • Sunday 30th December Sol 143

    Posted by jbridges in Mars Science Laboratory Blog on December 30, 2012 Gale Crater is named after Walter Frederick Gale, an Australian astronomer in the early 20 th century (1865-1945).

  • Monday 20th August Sol 15

    Posted by jbridges in Mars Science Laboratory Blog on August 21, 2012 The robotic arm has been moved for the first time.  This is the 70 kg instrument which carries the X-ray spectrometer and close up imager MAHLI.

  • Sunday August 19th Sol 14

    Posted by jbridges in Mars Science Laboratory Blog on August 20, 2012 Excellent ChemCam  LIBS (Laser Induced Breakdown Spectroscopy Results) on our first rock.  This means that in addition to imaging data from MastCam we are now getting compositional data.

  • Researchers take on marathon challenge

    A host of generous fundraisers from the University took part in the 13-mile Leicester Half-Marathon on 25 October to raise money for worthy causes.

  • Session 1: Reference intervals for African Buffalo

    Discussion of planning the first session of an R Course

  • 21st May 2015 Sol 992

    Posted by jbridges in Mars Science Laboratory Blog on May 21, 2015 In a  first for the mission we have successfully climbed a slope at Mt. Stimson.

Back to top
MENU