Search

7501 results for: ‘jspSSM363的医院资产设备维修保养管理系统vue毕业设计✅项目合作 二开均可 TG:saolei44✅.mbpTgywuIH’

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • 29th January 2016 Sol 1238

    Posted by jbridges in Mars Science Laboratory Blog on January 29, 2016 Here is MAHLI’s selfie of Curiosity at work on the Hebron part of the Namib dune. Its a mosaic of 57 images.

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • 2nd October 2013 Sol 411

    Posted by jbridges in Mars Science Laboratory Blog on October 2, 2013 Mars Science Laboratory is having a team meeting at the California Institute of Technology (Caltech) in Pasadena, California.

  • 6th November 2013 Sol 445

    Posted by jbridges in Mars Science Laboratory Blog on November 6, 2013 Curiosity is having a software upgrade this week, so no science operations. We are still at Cooperstown and thinking about the close up images of the outcrop layers.

  • 23rd February 2015 Sol 907

    Posted by jbridges in Mars Science Laboratory Blog on February 23, 2015 Our next drill target is Telegraph_Peak.

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

Back to top
MENU