Search

6969 results for: ‘(自适应手机版)简约大气的图片相册类织梦网站模板 图片图集网站源码✅项目合作 二开均可 TG:saolei44✅.lZXbBtwcSiBEkIx’

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 1st May 2014 Sol 618

    Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana.  You can see that Red Mars is only a very thin layer on the planet.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

Back to top
MENU