Search

6965 results for: ‘2022独角兽影视系统1.1源码✅项目合作 二开均可 TG:saolei44✅.NQBIapXtjmm’

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • Friday 14th December Sol 127

    Posted by jbridges in Mars Science Laboratory Blog on December 14, 2012 Some of the most extraordinary MastCam images so far.  We are seeing finely layered, continuous beds, with some cross bedded layers.

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 1st May 2014 Sol 618

    Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana.  You can see that Red Mars is only a very thin layer on the planet.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

Back to top
MENU