Search

12992 results for: ‘正版炫酷盲盒商城V9, 扭蛋机一番赏盲盒H5源码, 支持易支付,盲盒商城系统,支持二开✅项目合作 二开均可 TG:saolei44✅.vMgizyJxhJX’

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

  • 27th November 2015 Sol 1176

    Posted by jbridges in Mars Science Laboratory Blog on November 27, 2015 We have reached the Bagnold Dunes and are driving through a gap. The dark colour is due to the iron and magnesium-rich composition  of the sand grains (minerals like olivine and pyroxene).

  • 4th October 2016 Sol 1480

    Posted by jbridges in Mars Science Laboratory Blog on October 4, 2016 This MAHLI mosaic view of Curiosity and Murray Butte no. 12 is where we have just been drilling Quela – the 14th drillhole on Mars.

  • 5th January 2014 Sol 503

    Posted by jbridges in Mars Science Laboratory Blog on January 5, 2014 After the break over the holidays we are back analysing and driving. It is small drives so far.

  • 10th April 2014 Sol 596

    Posted by jbridges in Mars Science Laboratory Blog on April 10, 2014 Here is a NavCam image of the Kimberley, with Mount Remarkable the small hill (less than 5 m high) which we are pointing towards.

  • 1st October 2014 Sol 767

    Posted by jbridges in Mars Science Laboratory Blog on October 1, 2014 This Left MastCam (‘M34’ because of the focal length) view shows the Pahrump drilled grains just before they are about to be sieved by closing up the scoop and sieve, then turning the whole robotic arm turret.

  • 24th September 2014 Sol 758

    Posted by jbridges in Mars Science Laboratory Blog on September 24, 2014 We are drilling at Pahrump (named after an old Shoshone, native American settlement in what is now Nevada).

  • MBiolSci Research Project (Cancer Cell Biology)

    Module code: BS4006 This module comprises a full-time, 4 month research project placement: 3 months of lab work and then 1 month for writing the dissertation and project presentation.

  • 23rd May 2014 Sol 639

    Posted by jbridges in Mars Science Laboratory Blog on May 23, 2014 This MAHLI image (with a contrast stretch) shows the path ahead towards Murray Buttes and across the dark dunes to Mt. Sharp.

Back to top
MENU