Search

6967 results for: ‘在线教育系统,网校搭建,小班课一对一直播教学✅项目合作 二开均可 TG:saolei44✅.rvOLpiVcOiR’

  • February 21st 2013 Sol 194

    Posted by jbridges in Mars Science Laboratory Blog on February 21, 2013 We are in the next stage of the drilling analysis process: the drilled sedimentary rock has been transferred to the scoop on the arm’s turret, prior to being taken into CHIMRA via the sieve, part of which...

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

  • April 9th 2013 Sol 240

    Posted by jbridges in Mars Science Laboratory Blog on April 9, 2013 We have now moved into the Solar Conjunction phase, so there will be fewer operational activities for the next few weeks.  We are parked at the John Klein site during this time.

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • 29th January 2016 Sol 1238

    Posted by jbridges in Mars Science Laboratory Blog on January 29, 2016 Here is MAHLI’s selfie of Curiosity at work on the Hebron part of the Namib dune. Its a mosaic of 57 images.

  • 5th April 2017 Sol 1658

    Posted by jbridges in Mars Science Laboratory Blog on April 5, 2017 The second Bagnold Dunes campaign is now drawing to a close.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

Back to top
MENU