Search

6985 results for: ‘售后工单管理系统扫码故障上报维修派单订单管理报修服务小程序✅项目合作 二开均可 TG:saolei44✅.xuhyQNfIyufdozD’

  • 6th November 2013 Sol 445

    Posted by jbridges in Mars Science Laboratory Blog on November 6, 2013 Curiosity is having a software upgrade this week, so no science operations. We are still at Cooperstown and thinking about the close up images of the outcrop layers.

  • 23rd February 2015 Sol 907

    Posted by jbridges in Mars Science Laboratory Blog on February 23, 2015 Our next drill target is Telegraph_Peak.

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • 21st January 2015 Sol 875

    Posted by jbridges in Mars Science Laboratory Blog on January 21, 2015 The MSL science operations have stood down for a few days whilst a software upgrade goes ahead.  Soon we will recommence the drilling campaign.

  • 4th March 2017 Sol 1627

    Posted by jbridges in Mars Science Laboratory Blog on March 4, 2017 We are continuing the Bagnold Dunes campaign, with  stops 3 and 4. This NavCam view shows the Curiosity robotic arm for the team’s examination.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

  • 1st August 2013 Sol 351

    Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).

  • 11th September 2014 Sol 746

    Posted by jbridges in Mars Science Laboratory Blog on September 11, 2014 We have now reached the first foothills in the Mt. Sharp part of the mission.  This area is called the Pahrump Hills.

  • 27th November 2015 Sol 1176

    Posted by jbridges in Mars Science Laboratory Blog on November 27, 2015 We have reached the Bagnold Dunes and are driving through a gap. The dark colour is due to the iron and magnesium-rich composition  of the sand grains (minerals like olivine and pyroxene).

Back to top
MENU