Search

6965 results for: ‘国庆节头像护旗手小程序源码_站长亲测✅项目合作 二开均可 TG:saolei44✅.RjQAwyihrCy’

  • 23rd February 2015 Sol 907

    Posted by jbridges in Mars Science Laboratory Blog on February 23, 2015 Our next drill target is Telegraph_Peak.

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • 14th January 2014 Sol 868

    Posted by jbridges in Mars Science Laboratory Blog on January 14, 2015 We have started the drilling activities at Pahrump (Mojahave outcrop).  This MAHLI image shows that the initial minidrill attempt turned up some unweathered fine grained sediment.

  • 17th July 2015 Sol 1047

    Posted by jbridges in Mars Science Laboratory Blog on July 17, 2015 The science team is considering the next drill target. ChemCam and APXS results suggest that the sediment compositions are changing within the Murray Formation, with more altered compositions.

  • 13th November 2015 Sol 1164

    Posted by jbridges in Mars Science Laboratory Blog on November 13, 2015 We are nearing the next major phase of the mission – the Bagnold Dunes campaign.

  • 9th August 2013 Sol 359

    Posted by jbridges in Mars Science Laboratory Blog on August 9, 2013 Here is a map showing close to our current location. We saw a pebble bed similar to what we found near Bradbury Landing on our first drive down Peace Vallis towards Yellowknife Bay.

  • 17th September 2013 Sol 397

    Posted by jbridges in Mars Science Laboratory Blog on September 17, 2013 We are now doing contact science at the Darwin outcrop.  The rounded clasts in the NavCam image show that it is conglomerate.

  • 23rd September 2013 Sol 402

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data.  The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.

  • 13th April 2015 Sol 955

    Posted by jbridges in Mars Science Laboratory Blog on April 13, 2015 We have left Garden City and are commencing a week of driving.  This also marks 10 km on the odometer, at up to 100 m a day we can travel quite quickly.

Back to top
MENU