Search
-
21st May 2015 Sol 992
https://staffblogs.le.ac.uk/mars/2015/05/21/21st-may-2015-sol-992/
Posted by jbridges in Mars Science Laboratory Blog on May 21, 2015 In a first for the mission we have successfully climbed a slope at Mt. Stimson.
-
Econometrics 1
https://le.ac.uk/modules/2024/ec2020
Module code: EC2020 Econometrics is the combination of statistics, economic theory and mathematics necessary to understand modern day life from a quantitative perspective.
-
1st September 2014 Sol 736
https://staffblogs.le.ac.uk/mars/2014/09/01/1st-september-2014-sol-736/
Posted by jbridges in Mars Science Laboratory Blog on September 1, 2014 We are in an uneven area of terrain with sand-filled hollows so we have changed direction, out of Hidden Valley and via Trilobite Crater. The rover planners ‘RP’s’ are cautious about slippage in sand.
-
21st December 2016 Sol 1556
https://staffblogs.le.ac.uk/mars/2016/12/21/21st-december-2016-sol-1556/
Posted by jbridges in Mars Science Laboratory Blog on December 21, 2016 I am Geo-Min Science theme lead for todays plan. As usual after 4 years of operations we are doing 3 sols of planning at one go.
-
1st May 2014 Sol 618
https://staffblogs.le.ac.uk/mars/2014/05/01/1st-may-2014-sol-618/
Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana. You can see that Red Mars is only a very thin layer on the planet.
-
31st July 2014 Sol 705
https://staffblogs.le.ac.uk/mars/2014/07/31/31st-july-2014-sol-705/
Posted by jbridges in Mars Science Laboratory Blog on July 31, 2014 We have been analysing the Windjana drill tailings for over 2 months now and have just dumped the drill tailings.
-
31st August 2015 Sol 1091
https://staffblogs.le.ac.uk/mars/2015/08/31/31st-august-2015-sol-1091/
Posted by jbridges in Mars Science Laboratory Blog on August 31, 2015 I am Geo Science Theme Lead today (Geo STL). Our top priority is to retake the APXS compostional analyses on the Buckskin drill tailings, as we missed first time around.
-
1st December 2014 Sol 825
https://staffblogs.le.ac.uk/mars/2014/12/01/1st-december-2014-sol-825/
Posted by jbridges in Mars Science Laboratory Blog on December 1, 2014 This NavCam image shows a dusty view of Mt Sharp and its layers. It is a sign that we are very close to summer solstice again.
-
21st October 2013 Sol 429
https://staffblogs.le.ac.uk/mars/2013/10/21/21st-october-2013-sol-429/
Posted by jbridges in Mars Science Laboratory Blog on October 21, 2013 We are now just a few more sols from the second waypoint.
-
1st August 2013 Sol 351
https://staffblogs.le.ac.uk/mars/2013/08/01/1st-august-2013-sol-351/
Posted by jbridges in Mars Science Laboratory Blog on August 1, 2013 We have moved from southern summer into southern autumn (northern spring equinox).