Search

9982 results for: ‘电影下载站织梦模板(自带1W7数据 采集)✅项目合作 二开均可 TG:saolei44✅.CGDhgRXGaK’

  • 17th January 2016 Sol 1226

    Posted by jbridges in Mars Science Laboratory Blog on January 17, 2016 Here is a MastCam image of the scoop taken from the Namib dune. This was taken just prior to closing the scoop and sieving taking place as the turret of the robotic arm was rotated.

  • 29th January 2016 Sol 1238

    Posted by jbridges in Mars Science Laboratory Blog on January 29, 2016 Here is MAHLI’s selfie of Curiosity at work on the Hebron part of the Namib dune. Its a mosaic of 57 images.

  • 27th November 2015 Sol 1176

    Posted by jbridges in Mars Science Laboratory Blog on November 27, 2015 We have reached the Bagnold Dunes and are driving through a gap. The dark colour is due to the iron and magnesium-rich composition  of the sand grains (minerals like olivine and pyroxene).

  • Sol 0 Monday 6th August

    Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 The next data relay via Mars Odyssey is at 12.30 am PDT (add 8 hours for BST). We will start the process of checking the instruments.

  • 3rd May 2013 Sol 263

    Posted by jbridges in Mars Science Laboratory Blog on May 3, 2013 Our first image has come back after conjunction.  Here is the Chemcam remote microimager (RMI) of our titanium calibration target.

  • 6th November 2013 Sol 445

    Posted by jbridges in Mars Science Laboratory Blog on November 6, 2013 Curiosity is having a software upgrade this week, so no science operations. We are still at Cooperstown and thinking about the close up images of the outcrop layers.

  • 9th September 2016 Sol 1455

    Posted by jbridges in Mars Science Laboratory Blog on September 9, 2016 We are heading toward a new drill site at the base of one the the buttes.  These are the landforms that dominate the landscape at this point in the traverse – The Murray Buttes.

  • 13th December 2016 Sol 1548

    Posted by jbridges in Mars Science Laboratory Blog on December 13, 2016 The Precipice drilling campaign has been curtailed because of a drill fault. The MSL rover engineers have been conducting a series of diagnostic tests to determine the cause and to prevent it happening again.

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

Back to top
MENU