Search
-
8th May 2014 Sol 624
https://staffblogs.le.ac.uk/mars/2014/05/08/8th-may-2014-sol-624/
Posted by jbridges in Mars Science Laboratory Blog on May 8, 2014 We have succesfully drilled Windjana and transferred the material to the CHIMRA system for CheMin analyses. Now we will be able to anslyes the tailings by ChemCam and APXS.
-
Sol 0 Monday 6th August
https://staffblogs.le.ac.uk/mars/2012/08/06/sol-0-monday-6th-august-1/
Posted by jbridges in Mars Science Laboratory Blog on August 6, 2012 1.30 am PDT More images from the latest data relay. We get to work – linking it to what we saw from the orbital images and describing what we see.
-
Wednesday 12th September Sol 36
https://staffblogs.le.ac.uk/mars/2012/09/12/wednesday-12th-september-sol-36/
Posted by jbridges in Mars Science Laboratory Blog on September 12, 2012 We have been working on data today – a variety of scientists from different specialities, nationalities and approaches to the data. Thats how we will solve the scientific issues.
-
5th December 2013 Sol 474
https://staffblogs.le.ac.uk/mars/2013/12/05/5th-december-2013-sol-474/
Posted by jbridges in Mars Science Laboratory Blog on December 5, 2013 We have paused to do some contact science, using the robotic arm to use APXS on the local rocks.
-
Accessibility statement
https://le.ac.uk/policies/accessibility
Read the University of Leicester's statement relating to accessibility.
-
Sunday 23rd September Sol 47
https://staffblogs.le.ac.uk/mars/2012/09/23/sunday-23rd-september-sol-47/
Posted by jbridges in Mars Science Laboratory Blog on September 23, 2012 Mankind versus Machine #2 The robotic arm is over the calibration rock Jake_ Matijevic.
-
Tuesday August 14th Sol 9
https://staffblogs.le.ac.uk/mars/2012/08/14/tuesday-august-14th-sol-9/
Posted by jbridges in Mars Science Laboratory Blog on August 14, 2012 Barack Obama talked to the JPL engineering team yesterday and everyone else watched a video link of this.
-
March 30th 2013 Sol 231
https://staffblogs.le.ac.uk/mars/2013/03/30/march-30th-2013-sol-231/
Posted by jbridges in Mars Science Laboratory Blog on March 30, 2013 We are now back to full operations after the software problems, and getting in observations prior to the planetary conjunction.
-
12th June 2013 Sol 302
https://staffblogs.le.ac.uk/mars/2013/06/12/12th-june-2013-sol-302/
Posted by jbridges in Mars Science Laboratory Blog on June 12, 2013 We are carefully positioning ourselves for Point Lake.
-
13th October 2015 Sol 1133
https://staffblogs.le.ac.uk/mars/2015/10/13/13th-october-2015-sol-1133/
Posted by jbridges in Mars Science Laboratory Blog on October 13, 2015 Here is the latest selfie – perhaps the best yet. It is from the Big Sky drill site (you can see the Big Sky drill hole and the drill tailings) in the lower left.