Search

17551 results for: ‘【完整源码】98娱乐金币卡房模式iOS 安卓双端app✅项目合作 二开均可 TG:saolei44✅.AqnMFQOgHwAtbt’

  • 10th January 2014 Sol 509

    Posted by jbridges in Mars Science Laboratory Blog on January 10, 2014 The HiRISE camera on Mars Reconaissance Orbiter keeps an eye on our progress, sending back photos every few months.

  • 1st May 2014 Sol 618

    Posted by jbridges in Mars Science Laboratory Blog on May 1, 2014 Here is a MastCam image of drilling in progress. This is the first ‘minidrill’ hole at Windjana.  You can see that Red Mars is only a very thin layer on the planet.

  • 5th August 2014 Sol 710

    Posted by jbridges in Mars Science Laboratory Blog on August 5, 2014 We are moving into a new sort of terrain as we enter Hidden Valley.  On this HiRISE image and the inset MAHLI image you can see the sand ripples that we are traversing.

  • 15th August 2014 Sol 720

    Posted by jbridges in Mars Science Laboratory Blog on August 15, 2014 We have retraced our tracks in Hidden Valley, going back to a site called Bonanza_King.

  • 28th December 2015 Sol 1206

    Posted by jbridges in Mars Science Laboratory Blog on December 28, 2015 The MSL team is taking a break from operations for a few days.  We have dumped the Greenhorn drill tailings and are progressing on the Bagnold Dunes campaign.

  • 17th September 2013 Sol 397

    Posted by jbridges in Mars Science Laboratory Blog on September 17, 2013 We are now doing contact science at the Darwin outcrop.  The rounded clasts in the NavCam image show that it is conglomerate.

  • 23rd September 2013 Sol 402

    Posted by jbridges in Mars Science Laboratory Blog on September 23, 2013 This image shows the arm deployed over the conglomerate and veins as we gather more MAHLI data.  The shadow from the arm shows how we are operating at near noon, local time at Gale Crater.

  • 13th April 2015 Sol 955

    Posted by jbridges in Mars Science Laboratory Blog on April 13, 2015 We have left Garden City and are commencing a week of driving.  This also marks 10 km on the odometer, at up to 100 m a day we can travel quite quickly.

  • 6th July 2016 Sol 1392

    Posted by jbridges in Mars Science Laboratory Blog on July 6, 2016 No current  photos because MSL has gone into safe mode for the last few days due to a software glitch. That means we wont get images or much data back for a few days.

  • Monday 10th December Sol 123

    Posted by jbridges in Mars Science Laboratory Blog on December 10, 2012 Here is a Mastcam image of the new terrain we are exploring.  You can see layered deposits in the middle distance and a flat eroded surface in the near field.

Back to top
MENU